ENTRE PRISES

CLIMBING WALLS

The Entre-Prises Climbing Wall Design Process


Entere Prises. Climbing Walls.
Clip'n Climb
Join Our Email List
About Portfolio Climbing Walls Caves Boulders News Services Mobile Walls Holds / Store Contact Us
The Entre-Prises Climbing Wall Design Process > Engineering Study


Climbing Wall Engineering Study

Our in-house study department calculates the reaction forces for the facility in accordance with European Standard EN12572. The reaction forces must be approved by the client's engineer. The structural elements of the facility are then designed and specified in accordance with appropriate Eurocodes and EN12572.

Once completed, our structural calculations are signed off by an approved engineer of your choosing, so you can be safe in the knowledge that your climbing facility will be both great fun and completely safe.

When your fully-engineered design has been approved and signed off, we are ready to move onto the next stage - Fabrication.

 

 

Navigation: (Click To Proceed)
Climbing Wall Project Analysis Climbing Wall Project Design Climbing Wall Engineering Study Climbing Wall Fabrication Climbing Wall Installation and Conformity

Climbing Wall Engineering Study